Ecology

EPC CONSTRUCTION

EPC (Engineering, Procurement and Construction)

Preparation of projects according to the connection permit that received from the distribution company.

Approval of projects by (TEDAŞ) Turkey electricity distribution company.

Supply of the materials that used during the Project.

Making the area, where the operation will be done, suitable for the operation.

Temporary acceptance of the power plant where the operation is done by TEDAŞ and distribution company.

After the grid connection, power plant is delivered to investor.

Training the staff who take charge in power plant.

THE PRODUCTS THAT USED IN SOLAR  POWER PLANTS

Provides supply, installation, commissioning, maintanance and service of the products that required for the installation of the solar energy power plant.

REQUIRED SYSTEM COMPONENTS FOR THE SOLAR  POWER PLANT

-Photovoltaic Panels.

-Photovoltaic inverters and remote viewing system.

-Air position sensors.

-Loard bearing construction.Cables and connectors for panel-inverter connection.

-Communication cables and accessories to connect the inverter-remote viewing system.

-Low-voltage switchboard.

-AC (alternating current) cables to provide panel connection the inverter-low voltage (LG).

-Substation and distribution center buildings including transformer, sell and transformers cubicle.

– The medium voltage cables or electricity transmission line that provide the grid connection of the photovoltaic system.

-SCADA- automation system and accessories CCTV camera system and accessories for power plant security.

– Wire fence and lighting system for power plant’s security.

How can i help you ?

For detailed information, please contact us.
.